⚖️

Auditor Workspace & Regulatory Terminal (Screen 4)

CRS & RDSO COMPLIANTRFC 8785 IMMUTABLE LEDGER

Commissioner of Railway Safety (CRS) Statutory Decision Log, Cryptographic Seal & Form 14B Certification

👤 Role: Safety Auditor (CRS-MUM)

Immutable Decision Ledger

6 of 6 Records
🔍
Dept:
Status:
#JB-2026-0926-01JOINT
2026-09-26 01:30 IST

Dadar TC-03 Joint Track + OHE Shadow Block

TC-03 UP Slow Line (KM 9.2 - 15.5)

Saved 85 mins (38.4%)SANCTIONED & LOCKED
#JB-2026-0926-02JOINT
2026-09-26 02:15 IST

Kurla-Thane Joint Fast Corridor Block

TC-04/05 DOWN Fast Line (KM 15.5 - 33.2)

Saved 60 mins (28.5%)SANCTIONED & LOCKED
#BLK-SIG-0925-88SMMS
2026-09-25 23:14 IST

Kurla TC-04 Interlocking Relay Overhaul

TC-04 Signaling Relay Room & Point SW-04

Duration: 60 mins • Form S&T/T-351COMPLETED & VERIFIED
#BLK-TRD-0925-12TDMS
2026-09-25 03:00 IST

Thane-Kalyan 25kV Catenary Routine Inspection

TC-05/06 25kV OHE Catenary

Duration: 120 mins • Clean WindowARCHIVED
#BLK-CIV-0924-44TMS
2026-09-24 01:00 IST

Byculla UP Fast Deep Track Screening (BCM)

TC-02 UP Fast Line (KM 4.8 - 9.2)

Duration: 180 mins • Ballast ClearedCOMPLETED & VERIFIED
#JB-2026-0924-03JOINT
2026-09-24 02:30 IST

Matunga Car Shed Point & OHE Integration

TC-02/03 Siding Yard Junction

Saved 45 mins (22.0%)ARCHIVED
Engine:SHA-256 (RFC 8785)
⚡Auditor Penetration & Tamper TestAUTHENTIC

Toggle simulated payload tampering to verify the RFC 8785 SHA-256 cryptographic check catches modified speed restrictions or forged operator credentials.

Explainable AI Decision Dossier

RDSO FORM 14B
SHA-256 Cryptographic Audit SealVERIFIED TAMPER-FREE
SHA-256 Audit Seal Signature:
740ac65801902f67902cd6e48d19fb704e7c25b9a284e574370720a50c9027d7
Canonical Block: #JB-2026-0926-01Section Officer: CTRL-MUM-402 (Sr. DOM / Section Controller)
Click any step to inspect telemetry details & statutory rules:4 Verification Gates
1
Multi-Source Defect Ingestion & Spatial Normalization01:15:02 IST

Ingested TMS-804 rail flaw, TDMS-312 catenary wear, and SMMS-109 point stroke telemetry; mapped chainage to TC-03 (Dadar).

▲
Agent Subsystem:IngestionNormalizerAgent (Spatial & Defect Fusion)
Regulatory Rule Base:IRPWM Ch 5 Para 502 & ACTM Vol II Para 204
Execution Stage:INGESTION • PASS
2
Traffic Conflict & White-Corridor Search01:18:24 IST

Evaluated 13,000+ train paths from COA; confirmed 0 passenger train cancellations and identified nocturnal lull (01:30 - 04:45 IST).

▼
3
Joint Shadow-Block Co-Location Bundling01:22:45 IST

Bundled Civil track tamping and S&T point overhaul under de-energized 25kV OHE; saved 85 minutes of cumulative corridor downtime (38.4% reduction).

▼
4
Safety Dissemination & Interlocking Sanction01:28:14 IST

Enforced Form S&T/T-351 lockout, clamped entry Signal S-12 to RED, and broadcast wireless Kavach TSR (30 km/h) packet to approaching locomotives.

▼